Sunday, May 14, 2006
The News For Now
Obviously a lot has happened in the past almost two months. The fourth wall was raised, the second floor joist is in place (secured into the frame, and supported by pillars), the second story joists are in place (secured at one end on the second story main joist, and to the frame at the wall), the frame is covered with a petroleum basaed strengthening and protective sheath, and it's been covered in tarp to protect from water.
The pictures are, from left to right, looking through the kitchen (which is open to the second floor) towards the second floor bathroom, looking straight up through the stairwell to the north, the building viewed from the southwest side, looking to the east from the stairwell.