Sunday, December 25, 2005
More plumbing
I've been lazy about getting out to the site to get pictures, but there has been work progressing. This picture (and the next few I'll post) were taken by Dave Stecher.
The plumbing was installed and inspected (denoted by the green sticker) The blue tubing is the water line, the vertical white pipes are from left to right: kitchen drain, shower drain, second floor soil stack, bathroom sink, floor drain, toilet.
You can also see in these pictures the white expanded polystyrene (EPS) insulation slabs which had been purchased on December first from ACH Foam Technologies in Waukegan, IL. The foam is being stored where the slab will be to prevent the ground from freezing.